[1] Cheng Y. 1998 Solving push-out conflicts in apron taxiways of airports by a network-based simulation. Computers & Industrial Engineering, 34(2), 351–369.
[2] Babić O., Teodorović D., and Tošić V., 1984 “Aircraft Stand Assignment to Minimize Walking.” Journal of Transportation Engineering, 110 (1), 55–66.
[3] Mangoubi R., Mathaisel F. 1985 OPTIMIZING GATE ASSIGNMENTS AT AIRPORT TERMINALS. Transportation Science, 19(2), 173–188.
[4] Bihr R. 1990 A Conceptual Solution to the Aircraft Gate Assignment Problem Using 0,1 Linear Programming. Computers and Industrial Engineering 19, 280-284.
[5] Haghani A., Chen M. 1998 Optimizing Gate Assignments at Airport Terminals. Transportation Research Part A: Policy and Practice, 32 (6), 437–454.
[6] Jiefeng X., Bailey G. 2001 The Airport Gate Assignment Problem: Mathematical Model and a Tabu Search Algorithm. Proceedings of the Hawaii International Conference on System Sciences, 77.
[7] Maharjan B., Matis T. 2011 An Optimization Model for Gate Reassignment in Response to Flight Delays. Journal of Air Transport Management, 17(4), 256-261.
[8] Atkin J. A. D., Burke E. K., Ravizza S. 2011 A more realistic approach for airport ground movement optimisation with stand holding. In Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Applications, Phoenix, USA.
[9] Kim S. H., Feron E. 2012 Impact of gate assignment on gate holding departure control strategies. In Proceedings of the IEEE/AIAA 31st Digital Avionics Systems Conference, IEEE, Williamsburg, USA, 4E3-1–4E3-8.
[10] Narciso E., Piera M. 2015 Robust Gate Assignment Procedures from an Airport Management Perspective, Omega, 50, 82-95.
[11] Liu S., Chen W., Liu J. 2016 Robust assignment of airport gates with operational safety constraints. International Journal of Automation and Computing, 13(1), 31-41.
[12] Pternea M., and Haghani Ali., 2018 Mathematical Models for Flight-to-Gate Reassignment with Passenger Flows: State-of-the-Art Comparative Analysis, Formulation Improvement, and a New Multidimensional Assignment Model, Computers and Industrial Engineering, 123, 103–118.
[13] Safari H., Faghih A., 2015 Solve project scheduling problems with resource constraints using a modified Imperialist Competitive Algorithm, Industrial Management Journal, 7(2), 333-364 (In Persian).