[1] Talebi, M., Vahedifar, F., Meehan, C.L., “Effect of Geomechanical and Geometrical Factors on Soil Arching in Zoned Embankment Dams”, ASCE, 2013, 1056-1065.
[2] Shamsayi, A., “Design and construction of reservoir dams”, Science and industry university publication, Iran, Vol. 2, 2004.
[3] Sharma, H.D., Embankment Dams, published by Raju Primlani for Oxford and IBH publishing co., 1991.
[4] Knigt, D.J., Davis, P.D., Naylor, D.J., "Stress-strain behavior of the Monavasu soft core rockfill dam: prediction, performance and analysis", Proceeding of 15th International Congress on Large Dams, Lausanne, Vol. 56 (1), 1299-1326.
[5] US Army Corps of Engineers, EM 1110-2-2300, General Design and Construction Considerations for Earth and Rock-Fill Dams, 2004.
[6] International Commission on Large Dams (ICOLD), Dam failures statistical Analysis, Bulletin 99, Paris: International Commission on Large Dams, 1995.
[7] Foster, M., Fell, R., Spannagle, M., “The statistics of embankment dam failures and accidents”, Can. Geotech. J., Vol. 37 (5), 2000, 1000-1024.
[8] Sherard, J. L.,“Hydraulic fracturing in embankment dams.”, J. Geotech. Geoenviron. Eng., ASCE, Vol. 112 (10), 1986, 905-927.
[9]- Kullaway, F. H., Gurtowski, T. M., “Load transfer and hydraulic fracturing in zoned dams”, J. Geotech. Geoenviron. Eng., ASCE, Vol. 102 (9), 1976, 963-974.
[10] Najm, K., “Monitoring and instrument in dams”, Proceeding of 4th Conference on Dam Construction, Tehran, IRAN, Dec. 2000. (In Persian)
[11] Niroomand, H., Mirghasemi, A., Pakzad, M., ”Behavior assessment of Karkhe dam in construction phase with instrumentation results”, Proceeding of 4th Conference on Dam Construction, Tehran, IRAN, Dec. 2000. (In Persian)
[12] Khadem ghaemi, A., Boloori bazaz, J., Khajavi, K., “Behavior assessment stresses generation in Tabarak dam in first dewatering”, Proceeding of 2nd National Dam Engineering Conference, Azad university, Zanjan branch, Mar., 2010. (In Persian)
[13] Sharifi, A., Ghaderi, K., Rahnama, M., “Static analysis 45 Khordad Earth damd in service life with instrumentation and FEM” Proceeding of 1st National Conference on Civil Engineering and Sustainable Development, Azad university, Rasht branch, Jan., 2015. (In Persian)
[14] Amini, S., Tayari, A., Salajeghe, A., “Study behavior stress and pore pressure in construction phase ARAK earth dam with comparison of instrumentation and analytical value” Proceeding of 1st National Conference on Structure- Earthquake- Geotechnics, Institute of Higher Education Pardisan, Babolsar, Dec., 2010. (In Persian)
[15] Mirhosaini, F., Tayari, A., Ghaderi, K., “Numerical Anslysis of vertical stress with Plaxis and comparison with Geostudio result in end construction phase of Baft dam”, Proceeding of 6th National CongressonCivil Engineering, Babol, Apr., 2011. (In Persian)
[16] Report on “instrumentation Baft dam”, AB NIROO consultant, 2013. (In Persian)
[17] Report on, “Numerical analysis Baft dam and compare with instrumentation result”, AB NIROO consultant, 2012. (In Persian)